article · 1977
Provision of Electrical Power throughout the Stack of the Nuclear Structure Facility Tandem at Daresbury Laboratory
The provision of electrical power to supply magnets, beam optical elements, and vacuum pumps distributed throughout the stack of the NSF 30 MV tandem is not ...
0 citationsDOI: https://doi.org/10.1109/tns.1977.4328885