article · 2008
Using the MD CAD model to develop the time-cost integrated schedule for construction projects
This paper presents a work-item-based scheduling system that employs MD CAD model, Object Sequencing Matrix (OSM), and Genetic Algorithms (GAs) to generate t...
6 citationsDOI: https://doi.org/10.3846/isarc.20080626.573