CitedEvidenceResearch APIs

Article

Article detail, metadata, authors, and available full-text links.

Paper reader

Loading paper...

report · 1948

Final report on Production Test 105-58-P -- B Pile reactivity under shutdown conditions

Following the shutdown of the B Pile in March 1946 a method was devised for monitoring the sub-critical reactivity such that any significant change in neutro...

0 citationsDOI: https://doi.org/10.2172/10122028Open accessPDF reported by metadata
Final report on Production Test 105-58-P -- B Pile reactivity under shutdown conditions